Updated information from the project

The project “LIFE Riverscape Lower Inn” was approved in 2020. Here you will find regularly updated information on the progress of the project.

07/14/2023

Groundbreaking for fish pass at Braunau-Simbach

Start of construction on the near-natural bypass river of the Braunau-Simbach power plant: the dynamic design of the bypass river offers space for protecting species diversity in and around the water.
Press release on the groundbreaking
November 2022

Land restoration measures at Ering-Frauenstein

Go to video
April 2022

ARTE: "Paradiese aus Menschenhand"

An ARTE documentary on "Paradiese aus Menschenhand" (paradises wrought by human hand) reports on the "Reboot of a lifeline" and shows that hydropower, ecology and environment go hand in hand – also thanks to the measures taken by VERBUND.

ARTE documentary
February 2022

Completion of the preparatory work

for clearing the building site in the area of the planned bypass river at the Braunau-Simbach power plant
November 2021

Preparatory work

for the construction of the bypass river at the Braunau-Simbach power plant
November 2021

Inn river bank restoration in the area of the Mattig estuary

In the area of the Braunau-Simbach power plant, the reconstruction of the bank of the Inn in the area of the Mattig estuary (a contribution to the INTERREG project "INNsieme")
October 2020

Project launch

Kick-off of the LIFE Riverscape Lower Inn project with LIFE funding